Industries
Industry solutions – customer value and productivity through agility.
Customers expect individual products ever faster – and they remember whether the promise was kept. A synchronised supply chain management concept, delivered as a service, brings mass customisation to extensive product structures and multi-supplier networks – without investment in premises or production.
The same logic works in an assembly plant, in project installations and in the operating theatre. When everything is prepared, work flows like a dance.
For each industry we describe the process, special requirements, typical challenges and a vision of the future – as well as the target operating model and its benefits. The services used to implement the model can be found on the Services page.
Technology industry
Machinery, equipment and health technology. Contract manufacturers as one extended production.
Throughput 2× in the same factory
Vehicle industry
Own production in efficient batches – the customer gets a JIT/JIS sequence.
A new service without investment in premises or production
Hospitals and healthcare
Materials, equipment and contingency packs ready for every operation.
Operations on time, even when surprises happen
Installation and projects
Every installation gets its own kit in installation order.
Installer productivity up to 2×
Technical wholesale
A ready kit to the point of use instead of individual items.
A way out of price competition
Project, lean and agile
Forecast capacity, not products.
SILS (Supply-in-line-Sequence) fits all three production models – the pace and kits are chosen accordingly.
| What changes | Project production | Lean | Agile and mass customisation |
|---|---|---|---|
| What is forecast | Resources and long lead times | Products and components | Capacity and raw materials |
| Demand | Single project | Stable and recurring | Variable and customer-specific |
| Variation | Designed to order | In advance by forecast | Last, according to the order |
| Key metric | Schedule and project margin | Eliminating waste | Lead time and flexibility |
| SILS | Kits by work phase | Kits for A, kanban for C | The whole flow in sequence |
