3 · Kit factory and consignment stock
Assemblers assemble, not pick – and the buffer stays off the line.
Our consignment stock keeps materials ready close to your factory, and our kit factory assembles them into kits delivered in sequence to the workstation. Value-adding assembly time increases and tied-up capital decreases.
Book an initial assessmentRemote sparring 45 min, free of charge
+43%
more capacity for assemblers
≈ 0.7 M€/yr
net benefit from the kit factory
≈ 820 k€
capital released
Kit factory
Assembler time for value-adding work – up to +43% capacity.
Picking by assemblers≈ 1.1 M€ / v
Same work in the kit factory≈ 0.4 M€ / v
Net benefit≈ 0.7 M€ / v
Example calculation: 50 assemblers, 1,600 h/yr, €45/h, picking 30%, kit factory ⅓ of the time.
Also: quality improves, onboarding is faster, variation is managed in the kit and buffer capital moves to consignment stock.
What to kit
Kit when it pays for itself.
Kit: A items, assemblies with variation and parts whose picking takes assembler time.
Don’t kit: small consumables and C items – these are handled by replenishment at the point of use.
Consignment stock
Buffer off the line – capital off the balance sheet.
A consignment warehouse close to your factory keeps the suppliers’ material in their ownership until it goes to the line. You get security of supply without storage on your own floor space.
Supplier-owned inventory
Material becomes yours only when it goes to the line.
Real-time stock levels
Stock levels, incoming deliveries and consumption in the same view in LOGATE CCC.
Floor space for production
Buffers and packaging out of the factory – space is freed for value-adding work.
≈ 820 k€
capital released when delivery frequency increases from weekly to every four hours (€900k/week material flow).
Optimised processes
Its own pace for every item.
With ABC-XYZ control you get 92% of the working capital benefit with 74% fewer deliveries than if everything ran on a 4-hour cycle.
A · 4 h
20% of items, 80% of value. Kits in sequence to the workstation.
B · 24 h
30% of items, 15% of value. Kanban near the point of use.
C · 7 days
50% of items, 5% of value. Two-bin or supplier-managed.
Book an initial assessment – half a day, €990 + VAT.
You get a view of improvement areas and the benefit potential right after the walk-through.